Apartment 4 is rented.

This is a no smoking  two bedroom apartment.

100_4416.jpg
Kitchen- not finished at time of photo

100_4414.jpg
Laundry closet

100_4413.jpg
Living area

100_4412.jpg
Front Bedroom

100_4411.jpg
Bathroom

100_4408.jpg
Back Bedroom

100_4409.jpg
Back bedroom closet

July 2016
 Renter has moved out and the unit needs to be cleaned, repaired, and walls painted. Plus there are a few chances we have been wanting to make which are being done at this time. Living room ceiling has been re textured, the back window replaced, and all the wood work has been painted a dark brown.

May 22, 2013
 Dishwasher  installed and working, AC unit has been repaired  and new stove scheduled to be delivered this week.

May 14, 2013
 We are almost ready to start taking applications for  this apartment. Today the new dishwasher was delievered and I finished cleaning the kitchen cabinets. All we need to do is install the dishwisher, finish cleaning the stove and shower doors and give the place a good inspection and cleaning.

March 29, 2013
  The flooring is taking a bit longer then planned. I still have the kitchen window to sand and paint. After the floor is finished we will be installing the wood trim, replacing some doors and cabinets, counter tops, applicances and hooking the water back up. Lots to do yet - but lots done.

March 24,2013
 All the walls have been given their second coat of paint and all windows repainted except the kitchen window. All flooring is scheduled to be installed this week after that I will paint the kitchen window. After that we will add the wood trim, new window blinds, counter top and replace appliances.

March 8  Kitchen window glass was replaced this morning. Last week we discovered that the electric for the baseboard heating had to be upgraded  and had to wait for the work to be done before we could continue.  We are now ready to continue with the drywall patching and window painting.

Feb.17, 2013  All the trim board has been removed from the apartment except around the kitchen window and A/C. The cabinets have been pulled out from the walls and  old applicances removed. The place is now bare - a new slate to work on! I will start painting the ceilings this week and Bill will continue with any patching that needs to be done before I can paint he walls. Lots of work finished  - but lots to do yet.

On Feb 10,2013 we started re-modeling this unit by removing the carpet, vinyl flooring and wood trim around floorboards and windows. The vinyl flooring is much harder to remove and will take awhile and is something that Bill will have to help with. I washed the walls to prepare them for patching and repainting after Chris and I removed all the woodworking.

KBC Apartments of Seymour,LLC -Located at 937 E. 4th Street , Seymour, Indiana 47274
Mailing address: KBC Apartments of Seymour,LLC. - P.O.Box 594, Seymour, Indiana 47274
Phone  1(812) 525-9281

Copyright @ 2014 by KBC Apartments os Seymour,LLC
 All Rights Reserved, including the right to reproduce any portion of this web site in any form whatsoever.  Renter's  form and applications  only may be copied and sent back to the KBC Apartments of Seymour,LLC address.